Questar Pipeline Company

First Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 06/21/2005, Docket: RP05-349-000, Status: Effective

First Revised Sheet No. 179G First Revised Sheet No. 179G : Effective

Superseding: Original Sheet No. 179G

PART 4

GENERAL TERMS AND CONDITIONS

(Continued)

 

information as soon as it is available to its shippers on the Informational

Postings section of its web site regarding the factors causing the OFO to be

issued and released.

 

8. PRESSURE AT RECEIPT AND DELIVERY POINTS

 

Shipper will deliver its gas at a pressure sufficient to enter Questar's

Clay Basin storage facility. The pressure of the gas delivered by shipper

shall not exceed the maximum allowable operating pressure (MAOP) that Questar

specifies for Clay Basin.

 

9. QUALITY

 

Gas delivered for injection must conform to specifications stated in the

General Terms and Conditions of Part 1 of this tariff.

 

10. MEASUREMENT AND MEASUREMENT EQUIPMENT

 

All volumes of gas delivered by shipper to Questar for parking or return

of loaned quantities, as well as all volumes of gas delivered to shipper by

Questar, shall be measured according to the general procedures stated in the

General Terms and Conditions of Part 1 of this tariff.

 

11. FACILITIES

 

Any requests for additional facilities associated with PAL1 service will

be considered according to the General Terms and Conditions of Part 1 of this

tariff.

 

12. FUEL REIMBURSEMENT

 

Shipper shall reimburse Questar for gas consumed in operations and

lost-and-unaccounted-for gas. Shipper will have the option to reimburse

Questar in-kind or in-cash. Questar reserves the right to re-evaluate and

revise the method used to recover fuel use and lost-and-unaccounted-for gas.