Questar Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/2001, Docket: RP01-329-000, Status: Effective
Third Revised Sheet No. 170A Third Revised Sheet No. 170A : Superseded
Superseding: Second Revised Sheet No. 170A
PART 3
GENERAL TERMS AND CONDITIONS
(Continued)
OFOs issued to a single class of shippers, will be
tendered through Questline. OFOs issued to individual
shippers will be posted on Questar's Informational Postings
and Questar will support further notification, to be
designated by shipper, through the following channels: (1)
up to two internet e-mail addresses provided by shipper or
(2) additional electronic notification designated by
shipper.
11. PRESSURE AT RECEIPT AND DELIVERY POINTS
Shipper will deliver its gas at a pressure sufficient
to enter Questar's Clay Basin storage facility. The
pressure of the gas delivered by shipper shall not exceed
the maximum allowable operating pressure (MAOP) that Questar
specifies for the receipt point.
Questar shall not be required to deliver gas to a
shipper at a pressure in excess of 750 psia.
12. QUALITY
Gas delivered for injection must conform to
specifications stated in the General Terms and Conditions of
Part 1 of this tariff.