Questar Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/21/2005, Docket: RP05-349-000, Status: Effective
Sub. First Revised Sheet No. 167A Sub. First Revised Sheet No. 167A : Effective
Superseding: First Revised Sheet No. 167A
PART 3
GENERAL TERMS AND CONDITIONS
(Continued)
K = Maximum possible reservoir deliverability at current storage
inventory
L = Deliverability unclaimed by FSS and PAL1 shippers from the firm
withdrawal allocation
M = Deliverability attributable to PAL1 shippers' parked quantities
* = Multiplication operator
NOTE: Working gas includes Questar's reserved capacity.
If any Rate Schedule FSS shipper elects, on any day, not to utilize all
or any portion of its withdrawal allocation, the amount not used shall be
allocated to all remaining Rate Schedule FSS shippers that desire additional
withdrawal allocation by using the above formula as modified to exclude the
data related to those shippers who have received all of the withdrawal
capacity that was requested by them.
If any FSS withdrawal capacity remains after Rate Schedule FSS
allocations, it shall be available first to the PAL1 shippers according to
their contract withdrawal quantity and Part 4 of the Tariff.
If any withdrawal capacity remains after service to FSS and PAL1
shippers, it shall be allocated pro rata among the ISS shippers, up to the
level requested, based on each shippers current storage inventory. This
procedure will be continued until (1) all requests are filled or (2) all
available withdrawal capacity is utilized.
In the event there is unclaimed ISS withdrawal capacity, it shall be
made available to other shippers: first as authorized overrun service and
second as Rate Schedule PAL2 service, and allocated, to the extent necessary,
pro rata to those shippers based on their service priority contained in § 9
of the General Terms and Conditions of this part.