Questar Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2002, Docket: RP00-397-005, Status: Effective
Sub. Sixth Revised Sheet No. 167 Sub. Sixth Revised Sheet No. 167 : Effective
Superseding: First Rev. Fifth Rev. Sheet No. 167
PART 3
GENERAL TERMS AND CONDITIONS
(Continued)
Any storage injection capacity remaining after
allocation to FSS storage shippers under this part will be
available for use in providing service under Rate Schedule
PAL1.
If any injection capacity remains after service to FSS
and PAL1 shippers, it will be allocated to ISS shippers, up
to the level requested, based on the inventory rate stated
in the ISS storage service agreement with the highest rate
being given the highest priority. When two or more shippers
are paying the same rate, available capacity will be
allocated pro rata up to the level requested, to those ISS
shippers that are paying the same rate. This procedure will
continue until (1) all the requests are filled, or (2) all
available injection capacity is utilized.
Any injection capacity remaining after allocation to
ISS shippers will be available for use in providing parking
and loaning service under Rate Schedule PAL2 with the
highest rate paid being given the highest priority. When
two or more PAL2 shippers are paying the same rate,
available capacity will be allocated pro rata up to the
level requested, to those PAL2 shippers that are paying the
same rate. This procedure will continue until (1) all the
requests are filled or (2) all available injection capacity
is utilized.
(b) Allocation of gas that can be withdrawn
daily from storage on a firm or interruptible basis during
the November 1 through March 31 withdrawal period shall be
calculated as follows:
FIRM WITHDRAWAL ALLOCATION = [(A/B)*(C-D)] + E
INTERRUPTIBLE WITHDRAWAL AMOUNT = [(K-C-M)+L]
A = FSS shipper's working gas remaining in storage
B = Total working gas remaining in storage for all FSS
shippers
C = Maximum possible reservoir deliverability
attributable to the sum of cushion and FSS
shipper's working gas inventory
D = Sum of FSS shipper's minimum required
deliverabilities
E = FSS shipper's minimum required deliverability