Questar Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/25/2005, Docket: RP05-401-000, Status: Effective
Sixth Revised Sheet No. 166 Sixth Revised Sheet No. 166 : Effective
Superseding: Fifth Revised Sheet No. 166
PART 3
GENERAL TERMS AND CONDITIONS
(Continued)
10. NOMINATION, ALLOCATION AND COMMENCEMENT OF SERVICE
10.1 Nomination. When nominating quantities of gas for injection into
or withdrawal from Clay Basin, shipper shall follow the nomination procedures
stated in the General Terms and Conditions of Part 1 of this tariff.
To the extent that it is operationally feasible and so long as other
shippers' scheduled nominations are met, Questar will adjust nominations for
the gas day for NNT service, subject to the terms of § 9 of the General Terms
and Conditions of Part 1.
10.2 Allocation.
(a) Allocation of the quantity of gas that can be injected daily
into storage on a firm basis during the May 1 through October 31 injection
period shall be calculated as follows:
INJECTION ALLOCATION = (X/Y)*Z
X = Firm shipper's annual working gas
Y = Sum of the annual working gas of all firm shippers
Z = Available injection capacity on any day 1/
* = Multiplication operator
NOTE: Working gas includes Questar's reserved capacity.
If any Rate Schedule FSS shipper elects, on any day, not to utilize all
or any portion of its injection allocation, the amount not used shall be
allocated to all remaining Rate Schedule FSS shippers that desire additional
injection allocation by using the above formula as modified to exclude the
data related to those shippers who have received all of the injection capacity
that was requested by them.
_____________________
1/ Available injection capacity will vary depending upon operating
conditions; principally, compressor suction and discharge pressures and the
designated main line receipt point (currently either Storage Main Line No. 70
or Main Line No. 58).