Questar Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/21/2005, Docket: RP05-349-000, Status: Effective
Fifth Revised Sheet No. 119 Fifth Revised Sheet No. 119 : Effective
Superseding: Fourth Revised Sheet No. 119
PART 2
GENERNAL TERMS AND CONDITIONS
(Continued)
(b) As soon as practicable following the completion of each
withdrawal period, Questar will determine, according to its normal operating
practices and procedures, the volume of working gas in each peaking storage
reservoir that became non-recoverable during the previous annual storage
cycle. The non-recoverable working gas at each reservoir shall be allocated to
the PAL2 service account and to the account of each shipper that utilized the
reservoir during the previous annual storage cycle based on the ratio of each
accounts' gross working gas in that reservoir during its previous annual
storage cycle to the sum of the gross working gas of all accounts that
utilized that reservoir during the previous annual storage cycle.
(c) Upon making the determination described in § 9 above,
Questar shall inform all shippers of the results of the determination. If any
shipper's actual working gas withdrawals from a particular aquifer storage
reservoir are found to exceed the difference between the shipper's gross
working gas and the shipper's allocated share of the non-recoverable working
gas in that reservoir during the previous annual storage cycle, the shipper
shall be solely responsible for reconciling such imbalance with all other
shippers that utilized the reservoir during the previous annual storage cycle.
10. QUALITY
Gas delivered for injection must conform to specifications stated in the
General Terms and Conditions of Part 1 of this tariff.
11. MEASUREMENT AND MEASUREMENT EQUIPMENT
All volumes injected into and withdrawn from storage and delivered to
shipper at Questar's peaking storage reservoirs will be determined according
to the General Terms and Conditions of Part 1 of this tariff.
12. FACILITIES
Any requests for additional facilities associated with peaking storage
service will be considered according to the General Terms and Conditions of
Part 1 of this tariff.