Questar Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/25/2005, Docket: RP05-401-000, Status: Effective
Fifth Revised Sheet No. 117 Fifth Revised Sheet No. 117 : Effective
Superseding: Fourth Revised Sheet No. 117
THIS SHEET WAS INADVERTENTLY SKIPPED BY ANOTHER FILING. WHEN I ASKED FERC
STAFF, 202-502-8589, THEY SAID TO LEAVE THIS ERROR AND FILE THE TARIFF SHEET
TO BE PAGINATED AFTER THE FILED SHEET THAT SKIPPED THIS SHEET. THAT IS WHY
THIS FILING HAS TWO SHEET NOS. 117. IGNORE THIS SHEET. IT IS ONLY A PLACE
HOLDER BECAUSE IT WAS NAMED AS BEING SUPERSEDED ANOTHER SHEET.
PART 2
GENERAL TERMS AND CONDITIONS
(Continued)
9.4 Sixty (60) days prior to the injection period, Questar will
provide to shipper Questar's best estimates of operating parameters and
conditions in its peaking storage reservoirs. Thirty (30) days prior to the
injection season, shipper will provide to Questar shipper's best estimates of
daily, monthly and annual quantities of gas to be injected into or withdrawn
from storage during the upcoming annual storage cycle.
9.5 Injection and Withdrawal of Gas.
(a) Questar shall not be required to operate the aquifer storage
reservoirs outside of the operating parameters stipulated in various
applicable certificate authorizations.
(b) Injections or withdrawals of gas, outside the injection and
withdrawal period, shall be at times and in the amounts operationally
achievable.
(c) Questar shall not be obligated to take any action related to
injection or withdrawal of working gas at any aquifer storage reservoir which,
in Questar's judgment, creates a risk of increasing the volume of non-
recoverable working gas in any aquifer storage reservoir. In addition, Questar
shall not be obligated to take any action which, in Questar's judgment,
creates a risk of damage to the storage formation or other facilities used to
inject gas into or withdraw gas from any aquifer storage reservoir.
(d) By the conclusion of the withdrawal period, shipper shall
complete the withdrawal of its recoverable working gas from the Chalk Creek
storage reservoirs to the maximum extent practicable. The withdrawals shall
begin no later than March 1 of each year, and, to the extent practicable,
shall be made at uniform rates. Shippers may leave all or part of their
working gas in place at the Leroy and/or Coalville storage reservoirs. Any
working gas remaining after any annual storage cycle may become
nonrecoverable.