Questar Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/21/2005, Docket: RP05-349-000, Status: Effective
Fourth Revised Sheet No. 115 Fourth Revised Sheet No. 115 : Effective
Superseding: Sub. Third Revised Sheet No. 115
PART 2
GENERAL TERMS AND CONDITIONS
(Continued)
9. NOMINATION, ALLOCATION AND COMMENCEMENT OF SERVICE
9.1 Nomination. When nominating quantities of gas for injection into
or withdrawal from each of the peaking storage reservoirs, shipper shall
follow the nomination procedures stated in the General Terms and Conditions of
Part 1 of this tariff.
9.2 Allocation.
(a) Shipper's allocation of gas that can be injected daily into
each peaking storage reservoir shall be calculated as follows:
INJECTION ALLOCATION = (A/B)*C
A = Shipper's annual working gas for a particular reservoir
B = Sum of the annual working gas of all PKS shippers at that
reservoir
C = Available injection capacity on any day at that reservoir
* = Multiplication operator
If any Rate Schedule PKS shipper elects, on any day, not to utilize all
or any portion of its injection allocation at a particular reservoir, the
amount not used shall be allocated to all remaining Rate Schedule PKS shippers
that desire additional injection allocation, at that reservoir, by using the
above formula as modified to exclude the data related to those shippers who
have received all of the injection capacity that was requested by them.
Any remaining injection capacity will be available for use in providing
parking and loaning service under Rate Schedule PAL2 with the highest rate
paid being given the highest priority. When two or more shippers are paying
the same rate, available capacity will be allocated pro rata up to the level
requested, to those PAL2 shippers that are paying the same rate. This
procedure will continue until (1) all the requests are filled or (2) all
available injection capacity is utilized.
(b) Shipper's allocation of gas that can be withdrawn daily
from each peaking storage reservoir shall be calculated as follows: