Questar Pipeline Company

First Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 06/21/2005, Docket: RP05-349-000, Status: Effective

Eighth Revised Sheet No. 75B Eighth Revised Sheet No. 75B : Effective

Superseding: Seventh Revised Sheet No. 75B

PART 1

GENERAL TERMS AND CONDITIONS

(Continued)

 

confirmations by Questar from upstream and downstream connected parties; 9:00

p.m. for Questar to provide scheduled quantities to affected shippers and

point operators. Scheduled quantities resulting from intra-day 2 nominations

shall be effective at 9:00 p.m. on gas day. Bumping is not allowed during the

intra-day 2 nomination cycle.

 

(iii) For purposes of § 11.1(a)(ii) and 11.1(b)(i) and (ii) above,

"provide" shall mean, for transmittals pursuant to standards 1.4.1 through

1.4.7, receipt at the designated site, and for purposes of other forms of

transmittal, it shall mean send or post.

 

11.2 Intra-day Nomination Requirements.

 

(a) As required by 18 C.F.R. § 284.12(b)(1)(i)(A), Questar shall

(1) give scheduling priority to any intra-day nomination submitted by a firm

shipper over nominated and scheduled quantities for interruptible shippers,

(2) provide the interruptible shipper with advance notice of any reduction in

its scheduled quantities resulting from an intra-day nomination by a firm

shipper and (3) notify the interruptible shipper whether penalties will apply

on the day its scheduled quantities are reduced. The above does not apply in

Intra-day Cycle II where bumping does not occur.

 

(b) Questar will provide notification of bumping through the

following channels, to be designated by shipper: (1) available on Questline's

shipper web reports and/or (2) up to two internet e-mail addresses provided by

shipper or (3) additional electronic notification specified by shipper.

 

(c) Questar will waive any penalties for bumped interruptible

shippers according to § 12.11 of these General Terms and Conditions.

 

(d) In accordance with 18 C.F.R. § 284.12(b)(1)(i)(B), an intra-

day nomination submitted on the day prior to gas flow will take effect at the

start of the gas day at 9:00 a.m.

 

11.3 Unconfirmed Nominations. Unconfirmed nomination procedures shall

conform to NAESB Standard 1.3.22(i)-(iv) as follows: