Questar Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/21/2005, Docket: RP05-349-000, Status: Effective
Eighth Revised Sheet No. 73 Eighth Revised Sheet No. 73 : Effective
Superseding: Seventh Revised Sheet No. 73
PART 1
GENERAL TERMS AND CONDITIONS
(Continued)
equal the RDC or level assigned to the corresponding delivery point. The sum
of the receipt point RDC or level and delivery point RDC or level must equal
the RDC shown in Shipper's Rate Schedule T-1 and NNT service agreements.
The sum of the firm shipper's primary receipt point capacities or level
of NNT service may not exceed the shipper's total RDC. Except as explained in
§ 10.2 below, the sum of a firm shipper's primary delivery point capacities
may not exceed shipper's total RDC.
10.2 Use of delivery points into storage.
(a) A shipper with non-segmented capacity that has also contracted for
firm storage service may utilize a storage facility for injections of gas into
storage and shall receive the priority level shown in § 9.1 of this Part for
determining scheduling of transportation capacity.
(b) A shipper with segmented capacity that also has contracted for
firm storage service may utilize a storage facility within its segmented CTP
as a segmented delivery point for injecting gas into storage in accordance
with the priorities for segmented capacity as set forth in § 9.1 of this Part.
(c) A Shipper's use of capacity at a storage delivery point may be no
greater than that shipper's allocated share of firm storage injection
capacity on that day. The quantity of gas associated with a shipper's
injections into storage will not be included in the sum of its primary
delivery point capacities discussed in § 10.1 of this Part.