Honeoye Storage Corporation
Original Volume No. 1A
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2000, Docket: CP00- 93-003, Status: Effective
Original Sheet No. 72 Original Sheet No. 72 : Effective
withdraw gas from interruptible Storage Capacity or return gas received as
Storage Overrun Quantity, should such capacity or gas be required by a firm
customer or by another interruptible Customer willing to pay a higher
interruptible Storage rate.
1.19 The term "Maximum Storage Quantity" shall mean the greatest number of Dths that Seller
Storage Overrun Quantity, if applicable.
1.20 The term "Month" shall mean the period beginning at 9:00 a.m. Central Time on
the first Day of a calendar month and ending at the same hour on the first Day of
the next succeeding calendar month.
1.21 The term "OBA" shall mean a contract between two parties which specifies the
procedures to manage operating variances at an interconnect.
1.22 The term "OFO" shall mean an order issued to deviate conditions which threaten
or could threaten the safe operations or system integrity of Seller's system or to
maintain operations required to provide efficient and reliable firm service.
Whenever Seller experiences these conditions, any pertinent order will be referred
to as an OFO.
1.23 The term "Point of Injection/Withdrawal" shall mean the point of interconnection
between Seller's Honeoye Storage Project and third party transporter's facilities
located in Ontario County, New York or such other location as may be designated
by Seller and its Customer.
1.24 The term "Psig" shall mean pounds per square inch gauge.
1.25 The term "Releasing Customer" shall mean any Customer who has agreed to
release capacity under Section 7 of Rate Schedule FSS.
1.26 The term "Replacement Customer" shall mean any Customer to which capacity is
released under Section 7 of Rate Schedule FSS.
1.27 The term "Seller" shall mean Honeoye Storage Corporation.