Canyon Creek Compression Company
First Revised Volume No. 1A
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/14/1991, Docket: MT90- 5-002, Status: Effective
First Revised Sheet No. 40 First Revised Sheet No. 40 : Superseded
Superseding: Original Sheet No. 40
RATE SCHEDULE ICS
-----------------
7.2 Customer shall reimburse Canyon for any Fuel Gas and
Unaccounted For Gas in transporting and compressing gas hereunder as
provided by Section 1.8 of the Volume No. 1 General Terms and
Conditions.
7.3 Canyon may from time to time and at any time at its sole
discretion charge any individual Customer for service under this
Rate Schedule ICS a charge which is lower than the applicable
maximum rate set forth in this Tariff; provided, however, that such
rate charged may not be less than the applicable minimum rate
specified in this Tariff. Unless otherwise provided in the ICS
Agreement, Canyon may commence such lower rate at any time on
twenty-four (24) hours' verbal or written notice and, unless
otherwise agreed to in the ICS Agreement, may increase such rate to
a level not to exceed the applicable maximum rate at any time on
twenty-four (24) hours' verbal or written notice. Any verbal notice
of an increase shall be confirmed in writing within forty-eight (48)
hours.
7.4 Canyon shall file with the Commission any and all
reports required by the Commission's Regulations setting forth the
applicable charge, the individual Customer(s) affected, the volume
transported and compressed, any provisions for discounts and any
other information which may be required.
7.5 Canyon shall have the right to file with any appropriate
regulatory authority and make changes effective in:
(a) The rates and charges applicable under this Rate
Schedule ICS, including both the level and design of such rates and
charges; or
(b) This Rate Schedule ICS.
Canyon agrees that Customer may protest or contest the
aforementioned filings, or may seek authorization from duly
constituted regulatory authorities for such adjustment of Canyon's
existing FERC Gas Tariff as may be found necessary to assure that
its provisions are just and reasonable.
7.6 In accordance with 18 C.F.R. Section 154.38 of the
Commission's Regulations, the ACA charge will be assessed.
8. MINIMUM BILL
None.