Canyon Creek Compression Company
First Revised Volume No. 1A
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/1991, Docket: RP91-123-000, Status: Effective
Original Sheet No. 19 Original Sheet No. 19 : Superseded
RATE SCHEDULE FCS
-----------------
also pay Canyon such other charges as are identified in this
Section 7 or in Sections 8, 9, 10 and 16 of this Rate Schedule FCS.
7.2 The monthly Reservation Charge for FCS service shall be
the applicable maximum unit reservation rate(s) set out in this
Tariff multiplied by Customer's MDQ. The maximum monthly Commodity
Charge shall be the applicable maximum unit Commodity Charge(s) set
out in this Tariff multiplied by the quantity of gas actually
received by Canyon during the billing month. For any scheduled
transportation and compression of volumes in excess of Customer's
MDQ, Customer shall pay as a Commodity Charge the Authorized Overrun
Service rate specified in this Tariff.
7.3 Customer shall reimburse Canyon for Fuel Gas and
Unaccounted For Gas required in transporting and compressing gas
hereunder in kind as provided by Section 1.8 of the Volume No. 1
General Terms and Conditions.
7.4 Canyon may from time to time and at any time, upon
twenty-four (24) hours' verbal or written notice, at its sole
discretion, or as provided in the FCS Agreement, charge any
individual Customer for service under this Rate Schedule FCS a
charge which is lower than the applicable maximum rate set forth in
this Tariff; provided, however, that such rate charged may not be
less than the applicable minimum rate specified in this Tariff.
Canyon will confirm any verbal notice of the applicable charge in
writing. Such notification shall specifically state the effective
date of such rate change and the quantity of gas so affected.
Unless otherwise agreed in the FCS Agreement, Canyon may at any time
increase or further decrease such decreased rate upon twenty-four
(24) hours' verbal notice to Customer, which notice shall be
confirmed in writing within forty-eight (48) hours.
7.5 Canyon shall file with the Commission any and all
reports as required by the Commission's Regulations setting forth
the applicable charge, the individual Customer(s) affected, the
volume transported and compressed, any provisions for discounts and
any other information which may be required.
7.6 Canyon shall have the right to file with any appropriate
regulatory authority and make changes effective in:
(a) The rates and charges applicable under this Rate
Schedule FCS, including both the level and design of such rates and
charges; or