Canyon Creek Compression Company

First Revised Volume No. 1A

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 05/01/1991, Docket: RP91-123-000, Status: Effective

Original Sheet No. 19 Original Sheet No. 19 : Superseded

 

RATE SCHEDULE FCS

-----------------

 

also pay Canyon such other charges as are identified in this

Section 7 or in Sections 8, 9, 10 and 16 of this Rate Schedule FCS.

 

7.2 The monthly Reservation Charge for FCS service shall be

the applicable maximum unit reservation rate(s) set out in this

Tariff multiplied by Customer's MDQ. The maximum monthly Commodity

Charge shall be the applicable maximum unit Commodity Charge(s) set

out in this Tariff multiplied by the quantity of gas actually

received by Canyon during the billing month. For any scheduled

transportation and compression of volumes in excess of Customer's

MDQ, Customer shall pay as a Commodity Charge the Authorized Overrun

Service rate specified in this Tariff.

 

7.3 Customer shall reimburse Canyon for Fuel Gas and

Unaccounted For Gas required in transporting and compressing gas

hereunder in kind as provided by Section 1.8 of the Volume No. 1

General Terms and Conditions.

 

7.4 Canyon may from time to time and at any time, upon

twenty-four (24) hours' verbal or written notice, at its sole

discretion, or as provided in the FCS Agreement, charge any

individual Customer for service under this Rate Schedule FCS a

charge which is lower than the applicable maximum rate set forth in

this Tariff; provided, however, that such rate charged may not be

less than the applicable minimum rate specified in this Tariff.

Canyon will confirm any verbal notice of the applicable charge in

writing. Such notification shall specifically state the effective

date of such rate change and the quantity of gas so affected.

Unless otherwise agreed in the FCS Agreement, Canyon may at any time

increase or further decrease such decreased rate upon twenty-four

(24) hours' verbal notice to Customer, which notice shall be

confirmed in writing within forty-eight (48) hours.

 

7.5 Canyon shall file with the Commission any and all

reports as required by the Commission's Regulations setting forth

the applicable charge, the individual Customer(s) affected, the

volume transported and compressed, any provisions for discounts and

any other information which may be required.

 

7.6 Canyon shall have the right to file with any appropriate

regulatory authority and make changes effective in:

 

(a) The rates and charges applicable under this Rate

Schedule FCS, including both the level and design of such rates and

charges; or