Canyon Creek Compression Company
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/01/2003, Docket: RP03-424-000, Status: Effective
Original Sheet No. 163C Original Sheet No. 163C : Effective
GENERAL TERMS AND CONDITIONS
----------------------------
information separated by commas in the following order: (1)
"Recall", (2) the recall notification period, (3) the Effected Date
in YYYYMMDD format, (4) Canyon's name or abbreviation (excluding
commas), and (5) Canyon's D-U-N-S number. The body of such E-mail
notification is to contain at least the affected Replacement
Shipper's Contract Number, the quantity of capacity being recalled,
and the Offer Number or Award Number, if necessary to uniquely
identify the capacity being recalled. For recalls that are effective
at non-standard times, the appropriate recall notification period is
to be included in the subject line and the effective time of the
recall is to be in the body of the E-mail. If Canyon allows capacity
recall notification mechanisms in addition to Internet E-mail, the
notification is to include at least the same level of information.
Affected Replacement Shippers are to manage internal distribution of
notifications of recall received from Canyon.
(2) The Releasing Shipper shall provide capacity
recall notification to Canyon through Canyon's Interactive Website.
The Releasing Shipper shall provide notice to its affected
Replacement Shipper at the same time it provides notification to
Canyon. The recall notification must specify the recall notification
period for the specified effective gas Day, as well as any other
information needed to uniquely identify the capacity being recalled.
The mode of notification is to be mutually agreed upon between the
Releasing and the Replacement Shipper.
(3) All recalled capacity notices must indicate
whether penalties will apply for the gas day for which quantities are
reduced due to a capacity recall.
(d) QUANTITY ALLOCATION
In the event of an intra-day capacity recall,
Canyon shall determine the allocation of capacity between the
Releasing Shipper and the Replacement Shipper(s) based upon the
Elapsed Prorata Capacity (EPC). In any recall notification provided
to Canyon, the quantity should be expressed in terms of the adjusted
total released capacity entitlements based upon EPC. EPC means that
portion of the capacity that would have theoretically been available
for use prior to the effective time of the intraday recall based upon
a cumulative uniform hourly use of the capacity. The amount of the
capacity allocated to the Replacement Shippers(s) should equal the