Canyon Creek Compression Company

Third Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 11/01/1997, Docket: RP97- 66-006, Status: Effective

Second Revised Sheet No. 20 Second Revised Sheet No. 20 : Effective

Superseding: First Revised Sheet No. 20

RATE SCHEDULE FCS

-----------------

 

5.2 Shipper shall reimburse Canyon for Fuel Gas and

Unaccounted For Gas required in transporting gas hereunder in kind

as provided by Section 1.10 of the General Terms and Conditions.

 

5.3 (a) Shipper shall reimburse Canyon within five (5) days

after costs have been incurred by Canyon for all fees required by

the FERC or any regulatory body including, but not limited to,

filing, reporting, and application fees to the extent such fees are

specifically related to service for that Shipper hereunder and are

not generally applicable fees (such as general rate case filing

fees).

 

(b) If Canyon constructs, acquires or modifies any

facilities to perform service hereunder, then as specified in an

agreement between the parties either:

 

(1) Shipper shall reimburse Canyon for the cost of

such facilities or facility modifications as described in the

General Terms and Conditions of this Tariff; or

 

(2) Canyon shall assess a monthly charge

reflecting such facility costs.

 

5.4 The ACA charge will be assessed, when applicable, as

provided in the General Terms and Conditions of this Tariff, on

volumes received by Canyon from Shipper under this Rate Schedule

FCS.

 

5.5 (a) Canyon shall have the unilateral right to file with

any appropriate regulatory authority and make changes effective in:

(1) the rates and charges applicable under this Rate Schedule FCS,

including both the level and design of such rates and charges; or

(2) the terms and conditions of this Rate Schedule FCS. Canyon

agrees that Shipper may protest or contest the aforementioned

filings, or may seek authorization from duly constituted regulatory

authorities for such adjustment of Canyon's existing FERC Gas Tariff

as may be found necessary to assure that its provisions are just and

reasonable.