(c) If Transporter reserves capacity for an expansion/extension
project, it will notify Shippers of its intent as part of
Transporter's posting of capacity on its Internet Website.
Transporter's posting for reserved capacity for future
expansion/extension projects shall include the following
information:
(1) a description of the project for which the capacity
will be reserved;
(2) the total quantity of capacity to be reserved;
(3) the location of the proposed reserved capacity on the
pipeline system;
(4) whether, and if so when, Transporter anticipates that
an open season for the capacity will be held or the
reserved capacity will otherwise be posted for bids;
(5) the projected in-service date of new facilities; and
(6) on an ongoing basis, how much of the reserved capacity
has been sold on a limited-term basis that would
otherwise be eligible for a right of first refusal.
The posting shall remain open for not less than five (5)
Business Days. Transporter will make reasonable efforts to
update the reservation posting up to the in-service date of
the project to reflect any material changes in the scope of
the project. If unsubscribed capacity that has been posted
for bid remains unsubscribed after posting, and if such
unsubscribed capacity is insufficient to serve the
expansion/extension project, the reservation posting or open
season will include a non-binding solicitation for turnback
capacity from Transporter's existing Shippers to serve the
expansion/extension project. Transporter shall post on the
Informational Postings area of its Internet Website a non-
binding solicitation for expansion project related turnback
capacity no later than 90 days after the close of an
expansion project's open season specifying the minimum term
for a response to the solicitation.
(d) If there are material differences between the terms and
conditions imposed on the expansion project open season and
the mandatory pre-reservation open season, Transporter shall
hold another open season for the available capacity that
uses the same terms and conditions used for the expansion
project open season. If the available capacity open season
is held subsequent to the expansion open season, Transporter
shall use the same terms and conditions used in the
expansion open season.