Ozark Gas Transmission, L. L. C.

First Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 11/16/2009, Docket: RP09-1040-000, Status: Effective

Second Revised Sheet No. 52 Second Revised Sheet No. 52

Superseding: First Revised Sheet No. 52

 

RATE SCHEDULE ITS (continued)

 

(c) For any and all filing fees or other costs incurred which

are related to the specific transaction and required in

connection with Shipper's ITS Agreement or by any applicable

regulation.

 

(d) For all charges incurred for scheduling and/or delivery

imbalances, as set forth in Sections 21, 23 and 24 of the

General Terms and Conditions of this FERC Gas Tariff.

 

3.3 Negotiated Rates. Shipper and Transporter may agree to negotiated

rates pursuant to Section 32 of the General Terms and Conditions

of this FERC Gas Tariff.

 

4. POINTS OF RECEIPT AND DELIVERY

 

4.1 Point(s) of Receipt. Shipper may use any Point(s) of Receipt on

Transporter's system to deliver, or cause to be delivered, Natural

Gas to Transporter for transportation service under this Rate

Schedule ITS.

 

4.2 Point(s) of Delivery. All Point(s) of Delivery on Transporter's

system may be used as the point(s) at which Transporter shall

deliver Natural Gas to or for the account for Shipper after

transportation.

 

5. GENERAL TERMS AND CONDITIONS

 

All of the General Terms and Conditions of this FERC Gas Tariff are

incorporated herein and made a part hereof; provided, however, that to

the extent that such terms and conditions are inconsistent with any

provision set forth herein, the terms and conditions of this Rate

Schedule ITS shall control.