Ozark Gas Transmission, L. L. C.
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/09/2010, Docket: RP10-232-000, Status: Effective
Second Revised Sheet No. 34 Second Revised Sheet No. 34
Superseding: First Revised Sheet No. 34
RATE SCHEDULE FTS (continued)
3.4 In addition to the rates charged for transportation provided under
this Rate Schedule FTS, Shipper shall reimburse Transporter:
(a) For the costs, as determined under Section 17 of the General
Terms and Conditions of this FERC Gas Tariff, of facilities
installed by Transporter with Shipper's consent to receive,
measure, transport and deliver Natural Gas for the account
of Shipper.
(b) For Fuel Usage and Lost and Unaccounted For. Shipper shall
tender to Transporter, in addition to volumes for delivery,
an additional volume of Natural Gas to reimburse Transporter
for Fuel Usage and Lost and Unaccounted for Gas, which will
be charged to Shippers under this Rate Schedule FTS using
the fuel reimbursement percentage and a Lost and Unaccounted
For ("LAUF") retention percentage shown on the currently
effective Statement of Rates for Rate Schedule FTS.
(c) For any and all filing fees or other costs incurred which
are related to the specific transaction and required in
connection with Shipper's Service Agreement or by any
applicable regulation.
(d) For all charges incurred for scheduling and/or delivery
imbalances, as set forth in Sections 21, 23 and 24 of the
General Terms and Conditions of this FERC Gas Tariff.