Ozark Gas Transmission, L. L. C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2000, Docket: RP00-257-000, Status: Suspended
First Revised Sheet No. 46 First Revised Sheet No. 46 : Suspended
Superseding: Substitute Original Sheet No. 46
RATE SCHEDULE ITS (continued)
transportation service to be provided by Transporter
is otherwise identical to the service being provided
under such ITS Agreement.
(c) Extension(s) of the term of an ITS Agreement
pursuant to an evergreen provision contained
thereunder shall not affect the Priority Date of
such ITS Agreement.
4. RATE
4.1 The rate to be charged by Transporter for all Natural Gas
delivered to Transporter under this Rate Schedule ITS
shall not be in excess of the Maximum Rate nor less than
the Minimum Rate. The currently effective Maximum and
Minimum ITS Rates are set forth on the Schedule of
Currently Effective Rates at Sheet No. 13 of
Transporter's FERC Gas Tariff, of which this Rate
Schedule ITS is part and is hereby incorporated herein.
Transporter shall not be required to provide any
requested transportation service if Shipper is unwilling
to pay the Maximum ITS Rate applicable to service under
this Rate Schedule ITS.
4.2 Unless Transporter notifies Shipper to the contrary, the
applicable rate shall be the Maximum ITS Rate.
Transporter may from time to time and at any time
selectively adjust, on a non-discriminatory basis, the
rate to be charged to any Shipper pursuant to Section
4.1. In addition, Transporter may from time to time and
at any time selectively adjust, on a non-discriminatory
basis, the level of costs to be reimbursed by any Shipper
pursuant to Section 4.4(c) (provided that such
adjustments shall not result in the allocation of costs
to other services). Any adjusted rate shall not exceed
the currently effective Maximum ITS Rate nor be less than
the currently effective Minimum ITS Rate. If Transporter
adjusts the rates charged to any Shipper under this
Section 4.2, Transporter shall file all required reports
with the Federal Energy Regulatory Commission.
The Maximum ITS Rate shall be adjusted each April 1 and
October 1 to reflect changes in the demand component of
the Maximum ITS Rate. Thirty (30) Days prior to each
such adjustment, Transporter shall make an informational
filing with the FERC showing the derivation of the
updated Maximum ITS Rate. Such