Ozark Gas Transmission, L. L. C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/1998, Docket: CP98-266-005, Status: Effective
Substitute Original Sheet No. 41 Substitute Original Sheet No. 41 : Effective
RATE SCHEDULE ITS (continued)
Transporter or Shipper may suffer, sustain, or be
liable for as the result of any interruption or
reduction of transportation service pursuant to this
Rate Schedule ITS, unless the interruption or
reduction is attributable to Transporter's gross
negligence or willful misconduct.
2.4 (a) Unless Transporter and Shipper agree to the
contrary, Transporter will install, or cause to be
installed, metering facilities in those instances
when new facilities are necessary to accommodate
receipt of gas under this Rate Schedule ITS into
Transporter's existing lateral lines if Shipper
agrees to reimburse Transporter for the costs
incurred for such installation, and provided that
such facilities shall (i) interconnect with an
existing lateral at a point that is mutually
agreeable to Shipper and Transporter and (ii) not
cause any operational constraints on Transporter's
system. Provided further, that Transporter shall
not be required to install any facilities extending
beyond Transporter's existing rights-of-way.
(b) When new and/or expanded facilities, other than
those specified in Section 2.4(a) above, are
required to accommodate receipt of Natural Gas under
this Rate Schedule ITS and Transporter determines
that installation of such facilities will be
economically beneficial to Transporter or provide
increased business opportunities for Transporter and
will not impair service to any Shipper or threaten
the integrity of Transporter's system, Transporter
shall construct such facilities.
(c) Except (i) as provided in Section 2.4(a) above, (ii)
where Transporter and Shipper mutually agree to
share in the cost, or (iii) where Transporter agrees
to pay for the entire cost, Shipper shall pay for
any facilities required to accommodate the receipt
of Natural Gas under this Rate Schedule ITS.
Transporter's determination to pay for all or a
portion of such costs shall be based on whether such
facilities will be economically beneficial to
Transporter.