Young Gas Storage Company, Ltd.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2010, Docket: RP10-921-000, Status: Effective
Third Revised Sheet No. 81 Third Revised Sheet No. 81
Superseding: Second Revised Sheet No. 81
GENERAL TERMS AND CONDITIONS
(Continued)
9.9 (Continued)
(a) all the items contained in Section 9.7 hereof required to
define a prearranged release;
(b) prearranged Shipper's legal name and the name and telephone
number of the individual responsible for authorizing the bid
for the prearranged release;
(c) the term of the proposed acquisition of capacity by prearranged
Shipper (minimum term of any release is one Day);
(d) the Reservation Rates, expressed as a daily rate or as a
percentage of the maximum Reservation Rates, as appropriate,
the prearranged Shipper has agreed to pay for the released
capacity and any minimum volumetric load factor, if applicable.
If capacity is released on a volumetric rate basis, it cannot
be rereleased by the Replacement Shipper;
(e) the capacity (MDWQ, MDIQ, and MAC) which prearranged Shipper
wishes to acquire stated in Dth;
(f) whether or not the prearranged Shipper is an affiliate of
Releasing Shipper or an affiliate of Transporter;
(g) whether or not the prearranged Shipper is an asset manager or a
marketer participating in a state-regulated retail access
program, as defined by FERC regulations at 18.C.F.R. 284.8;
(h) the time and date the notice is to be posted on Transporter's
electronic bulletin board. Release notice will be posted upon
receipt unless otherwise requested by Releasing Shipper. Open
season dates will be posted by Transporter based on the
requirements of Section 9.5 of this Tariff, if applicable, or
by Releasing Shipper, if Releasing Shipper requests a longer
open season than the minimum required in Section 9.5. Releasing
Shipper cannot allow extension of time provided for the
prearranged Shipper to match a higher bid (matching period as
described in the Timelines in Section 9.5 hereof) without
posting a new release;
(i) any other applicable conditions of the prearranged release.
9.10 Term of Released Capacity. The term of any release of firm capacity
shall not exceed the term of the Storage Service Agreement or
Replacement Capacity Agreement under which the release occurs, nor
shall it be less than one Day.