Young Gas Storage Company, Ltd.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2010, Docket: RP10-921-000, Status: Effective
First Revised Sheet No. 49A.01 First Revised Sheet No. 49A.01
Superseding: Original Sheet No. 49A.01
GENERAL TERMS AND CONDITIONS
(Continued)
1.26 "Injection Period" shall consist of the period commencing on June 1
of any year and continuing through October 31 of such year.
1.27 "Injection Quantity" is that quantity of Gas Tendered by Shipper or
for the account of Shipper less Fuel Reimbursement.
1.28 "Interconnecting Party" shall mean the Party or such Party's
designee that is responsible for operations of a natural Gas system
which interconnects with Transporter's system and is responsible for
verifying Nominations and scheduling Gas flow at such point of
interconnections. An Interconnecting Party is also a Confirming
Party. Each Interconnecting Party is required to conform to the
schedules set forth in Section 6 of these General Terms and
Conditions of this Tariff, unless specifically exempted by
Transporter.
1.29 "Intraday Nomination" shall mean a Nomination submitted by a
Nominating Party after the Timely Nomination deadline set forth in
Section 6 of these General Terms and Conditions and which has an
effective time no earlier than the beginning of the Gas Day and
which extends through the end of the Gas Day. (NAESB Standard 1.2.4)
Intraday Nominations shall be accepted for the following cycles
pursuant to the schedule set forth in Section 6 of these General
Terms and Conditions:
(a) Evening Cycle - the day prior to the Gas Day
(b) Intraday 1 Cycle - the morning of the Gas Day
(c) Intraday 2 Cycle - the afternoon of the Gas Day