Western Gas Interstate Company
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/1997, Docket: RP97-160-001, Status: Effective
First Revised Sheet No. 206 First Revised Sheet No. 206 : Effective
Superseding: ORIGINAL SHEET NO. 206
GENERAL TERMS AND CONDITIONS
(continued)
(g) The Dth delivered shall be calculated
by multiplying the Mcf Delivered by a
fraction the numerator of which is the Heat
Content and the denominator of which is
1,000.
3.3 Each test provided in this section shall be used
in the computation for the measurement of receipts
and deliveries until the next succeeding test.
3.4 The cutoff for the closing of measurement is 5
business days after the business month.
4. MEASUREMENT EQUIPMENT:
4.1 Installation and Operation by Western - Western shall
install, maintain and operate, at its own expense, at
or near each Delivery Point and Receipt Point, a
measuring station properly equipped with meters and
other necessary equipment by which the quantity of gas
delivered to Western or to Buyer or Shipper, as the
case may be, shall be measured. The quantity of gas
received or delivered hereunder shall be measured in
accordance with Section 3.2 and with the published
recommendations of the American Gas Association as
amended or superseded from time to time. Where Buyer
and Western so agree, Buyer, at the request of Western,
will change the charts on the meters at the Receipt
Point(s) and Delivery Point(s) daily or so frequently
as requested and send them promptly by mail to Western
without charges or cost to Western.
4.2 Calibration, Test of and Access to Meters - Buyer
or Shipper shall have the right to have
representatives present at the time of any
installing, cleaning, changing, repairing,
inspecting, testing, calibrating or adjusting done
in connection with Western's measuring equipment
used in the measurement of receipts or deliveries
of gas. The accuracy of Western's measuring
equipment may be verified by Western at reasonable
intervals but not more frequently than once in any
thirty (30) day period. In the event either party
shall notify the other that it desires a special
test of Western's measuring equipment or Buyer or
Shipper's check measuring equipment, as the case