Western Gas Interstate Company
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/1997, Docket: RP97-160-001, Status: Effective
First Revised Sheet No. 135 First Revised Sheet No. 135 : Effective
Superseding: ORIGINAL SHEET NO. 135
RATE SCHEDULE RCS
FIRM TRANSPORTATION SERVICE - RELEASED CAPACITY
(continued)
(b) the maximum and minimum quantities of daily firm
capacity which the Releasing Shipper elects to
release, stated in Dths;
(c) the Receipt and Delivery Points at which the
capacity is being released, and the firm capacity
to be released at each such point;
(d) the effective date and the maximum and minimum
period for the capacity to be released;
(e) whether the capacity is subject to recall by the
Releasing Shipper, and the terms under which the
capacity may be recalled;
(f) the maximum and minimum rates at which the
Releasing Shipper is willing to accept a bid for
the Released Capacity, specified in dollars and cents
or as a percentage of maximum tariff rate;
(g) the objective criteria under which the bids for
the Released Capacity will be evaluated selected
pursuant to section 9 of this Rate Schedule RCS; and
(h) any other applicable conditions of the release,
including whether the Bidding Shipper must comply
with the Releasing Shipper's creditworthiness
requirements in addition to Western's.
Offers of released capacity shall be binding until written
or electronic notice of withdrawal is received by Western.
A Releasing Shipper must specify in its Capacity
Release Notice any minimum requirements that a bid must
meet to be accepted. Once a valid bid is submitted
that satisfies those minimum conditions, if any, the
Releasing Shipper may only withdraw its offer to
release capacity where it has an unanticipated need for
the capacity. However, so long as no valid bid has
been submitted that meets its minimum conditions a
Releasing Shipper may withdraw its offer to release
capacity submitted under the terms of this Rate
Schedule at any time prior to the expiration of the
bid period as defined in Section 6 of this Rate
Schedule. A Releasing Shipper is not obligated to
accept any bid that does not meet the minimum