6.4.2.4 Establish (subject to the approval of the Committee)
special short-term operational rules or limitations on the use of
the Storage Project in order to accommodate special construction
or maintenance procedures. Such rules or limits shall be
established with due consideration to the needs of the Owners and
shall require sixty (60) days' notice to the Committee, unless
established in response to an Emergency as set forth in Section
6.4.5.
6.4.2.5 Enter into contracts identified during the budget process
and for those contracts not identified in the budget process, to
enter into such contracts within the budget limitations fixed by
the Committee as provided in Section 5.7.1.
6.4.2.6 Maintain records and accounts in conformity with
applicable provisions of the Uniform System and render statements
each Month for Storage Project costs and expenses incurred during
the prior Month.
6.4.2.7 Provide communications, surveillance, flow control,
corrosion control, monitoring, data acquisition, measurement, and
daily operating procedures set forth in this Agreement.
6.4.2.8 Provide periodic testing, adjustment, calibration of
meters, evaluation of cathodic protection, external inspection of
above-ground portion of the Storage Project, and maintenance of
all valves, piping, meters, and instruments and major overhaul and
replacement.
6.4.2.9 Submit reports, to the extent possible, to governmental
agencies applicable to routine services to the Storage Project
with copies of all such reports to all the Owners and advising
Owners of those reports which the Project Operator cannot submit.
6.4.2.10 By August 15 of each year prepare for Committee approval
an annual budget for the operation and maintenance of the Storage
Project which reflects the costs that the Project Operator