Puget Sound Energy, Inc.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/1998, Docket: CP98-250-002, Status: Effective
Original Sheet No. 12 Original Sheet No. 12 : Effective
1.12 Effective Date
"Effective Date" means Effective Date as defined in Section 11.1.
1.13 Feeder Line
"Feeder Line" means a pipeline extending from Northwest's Natural
Gas Transmission System easterly a distance of approximately one
and three-fourths (1-3/4) miles to the Storage Field and used for
the injection of natural gas into the Storage Reservoir and the
withdrawal of natural gas therefrom.
1.14 FERC
"FERC" means the Federal Energy Regulatory Commission, or its
regulatory successor.
1.15 Firm Injection Capability
"Firm Injection Capability" of an Owner means the right of such
Owner to deliver natural gas, on a daily firm basis, to the
Storage Project. The Firm Injection Capability of each Owner
equals the product of such Owner's Share of the Project Firm
Injection Capability multiplied by the Project Firm Injection
Capability, as set forth in Part 1 of Exhibit E as such part may
be revised in accordance with this Agreement.
1.16 Firm Withdrawal Deliverability
"Firm Withdrawal Deliverability" of an Owner means the right of
such Owner to receive natural gas, on a daily firm basis, from the
Storage Project. Maximum Firm Withdrawal Deliverability is such
Owner's Share of Project Firm Withdrawal Deliverability multiplied
by the Project Firm Withdrawal Deliverability, as set forth in
Part 1 of Exhibit E as such part may be revised in accordance with
this Agreement.