Viking Gas Transmission Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/01/2009, Docket: RP09-279-000, Status: Effective
Tenth Revised Sheet No. 70 Tenth Revised Sheet No. 70
Superseding: Ninth Revised Sheet No. 70
GENERAL TERMS AND CONDITIONS
21. RELEASES OR ASSIGNMENTS OF FIRM TRANSPORTATION AGREEMENTS (Continued)
21.1 Releasing Shipper's Request for Assignment
A Releasing Shipper that desires to release its rights to service on a basis
that does not qualify for an exemption from prior posting pursuant to
Subsection 21.3 of these General Terms and Conditions, may post directly on
Company's System the following information:
(a) Releasing Shipper's name and Firm Transportation Agreement number;
(b) the portion of the Releasing Shipper's TQ to be released (including any
minimum acceptable quantity);
(c) the proposed commencement date and term of the release (including any
minimum acceptable term);
(d) the amount of the firm capacity to be released at each Primary Point (the
total receipt point capacity released shall be equal to the total delivery
point capacity released);
(e) the reservation and/or usage rates and all other applicable rates, charges
and surcharges for the released service, including any applicable Minimum
Rate(s). For releases with a term of one year or less and the release is
to take effect on or before one year from the date on which the Releasing
Shipper notifies the Company of the release, the reservation and/or usage
rates that may be bid may exceed the Maximum Rates for the applicable
service being released as set forth on the applicable currently effective
tariff sheets;
(f) whether the transportation rights are to be released on a firm or
recallable basis and, if on a recallable basis, the specific conditions
for recall of the capacity; Pursuant to NAESB WGQ Standard 5.3.7
(Version 1.7): Transportation Service Providers should support the
function of reputting by Releasing Shippers. Pursuant to NAESB WGQ
Standard 5.3.8 (Version 1.0): Reput method and rights should be specified
at the time of the deal. Reput method and rights are individually
negotiated between the Releasing Shipper and Replacement Shipper;
(g) whether contingent bids will be accepted for evaluation and, if so,
whether the contingency can extend beyond the Bidding period; if the
contingency may extend beyond the Bidding Period, whether, and for what
time period, the next highest bidder will be obligated to acquire the
capacity should the winning contingent bidder exercise its option not to
take the capacity;
(h) whether the release is contingent on Releasing Shipper's ability to
release associated capacity on another pipeline and, if so, all conditions
associated with such contingency;