Viking Gas Transmission Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/01/2002, Docket: RP02-132-004, Status: Effective
First Revised Sheet No. 15G.1 First Revised Sheet No. 15G.1 : Superseded
Superseding: Original Sheet No. 15G.1
RATE SCHEDULE FT-C (Continued)
The sum of the maximum daily transportation quantities applicable to each Primary
Receipt and Primary Delivery Point combination shall not exceed the total maximum
daily transportation quantity under the Transportation Agreement.
On any day that Shipper schedules transportation service at a Primary or Secondary
Receipt Point(s) in an upstream rate zone in excess of the maximum daily quantity
applicable to such rate zone or schedules transportation service at a Primary or
Secondary Delivery Point(s) in a downstream rate zone in excess of the maximum
daily quantity applicable to such rate zone, Shipper shall pay a charge equal to
the difference between the applicable daily reservation rates for the upstream and
downstream rate zones on the quantity of gas received or delivered in excess of the
maximum daily quantity of the respective rate zone.