Vector Pipeline L.P.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2010, Docket: RP10-678-000, Status: Effective
Sixth Revised Sheet No. 141 Sixth Revised Sheet No. 141
Superseding: Fifth Revised Sheet No. 141
4. Posting of Release and Replacement Shipper Requests
(a) Transporter shall post the terms of a release under this
section 29 on Transporter's EBB as soon as possible, but not
later than the first nomination, after the release
transaction commences.
(b) Releasor has the right to withdraw its offer during the bid
period, whenever unanticipated circumstances justify and no
minimum bid has been made (NAESB Standard 5.3.16).
(c) Transporter shall post all applicable information on
Transporter's EBB for a Replacement Shipper Request. Such
requests shall remain posted for a period of four weeks or
until a transaction is effected, whichever is the shorter
period.
(d) Transporter shall post offers and bids, including pre-
arranged deals, upon receipt, unless Releasor requests
otherwise. If the Releasor requests a posting time, the
Transporter shall support such request insofar as it
comports with the standard timeline set forth in section
29.9. Transporter makes no representation or warranty to
any party concerning the accuracy or completeness of any
posted information, or concerning the willingness or ability
of any Releasor to release transportation rights hereunder
or of any Replacement Shipper to accept transportation
rights hereunder. Transporter shall not be liable to any
party for any damages, of any nature whatsoever, including
without limitation any special, incidental, or consequential
damages or any other kind that may arise in connection with
the posting of information hereunder, except that resulting
from the negligence, bad faith, fraud or willful misconduct
of Transporter.