Vector Pipeline L.P.

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 06/01/2010, Docket: RP10-678-000, Status: Effective

Second Revised Sheet No. 129 Second Revised Sheet No. 129

Superseding: First Revised Sheet No. 129

 

(b) Time that the OFO is considered to be effective (if no time

is specified, the OFO shall be effective immediately);

 

(c) Duration of the OFO (if none is specified, the OFO will be

effective until further notice);

 

(d) The party or parties to which the OFO applies;

 

(e) The conditions in accordance with section 16.1 above which

triggered the issuance of an OFO;

 

(f) The quantity of Gas required to remedy the operational

condition requiring the issuance of the OFO; and

 

(g) Any other term Transporter may reasonably require to insure

the effectiveness of the OFO.

 

Transporter will post a notice on its EBB informing Shipper(s)

when any OFO in effect will be canceled and state the line pack

conditions that occurred, or are projected to occur, that allowed

its cancellation.

 

4. Upon the issuance of an OFO by Transporter, it shall be incumbent

upon Shipper to adjust Gas quantities as directed within the time

frame specified in the OFO. Failure to comply in a timely fashion

with an OFO may result in an immediate interruption of all or a

portion of Shipper's service and cause Shipper to incur a penalty

per section 9.1 of the GT&C for all quantities in excess of that

allowed under the OFO. The payment of unauthorized overrun

penalties does not create the right to exceed the levels

established by an OFO. Transporter will not assess a penalty in

an OFO situation where an imbalance attributable to a Shipper has

been created due to the negligence of Transporter.

 

5. In the event a Shipper does not respond to the OFO, and

Transporter believes it is necessary to take actions such as

buying or selling Gas to maintain system integrity or to prevent

interrupting service to another Shipper, Transporter shall have

the right, but not the obligation, to take such remedial actions

as it deems necessary. If Transporter takes these actions, it

shall be made whole by the nonresponding Shipper for all costs

that Transporter incurs. Transporter shall not be liable for any

costs incurred by any Shipper/Operator in complying with an OFO.