Gulf South Pipeline Company L P
Sixth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2001, Docket: RP01-225-000, Status: Effective
Original Sheet No. 2902 Original Sheet No. 2902 : Superseded
GENERAL TERMS AND CONDITIONS
Section 24
24. CONSTRUCTION OF RECEIPT AND DELIVERY FACILITIES
24.1 For the purposes of this Section 24, "Requested Facilities" shall
mean Taps, M&R Equipment or other points of interconnection.
Requested Facilities shall not include a major expansion of
transmission facilities or laterals. "Tap" shall mean a delivery
tap and/or a point of interconnection where Gulf South receives
gas into its system including but not be limited to, flanges and
block valves and sufficient pipeline from Gulf South's existing
transmission facilities to the edge of its right-of-way. "M&R
Equipment" shall include miscellaneous connecting pipeline to the
tap, meters, compression, flow and pressure regulators,
filters/separators, gas heaters, flanges, check valves, electronic
gas measurement, communication equipment and gas conditioning and
odorization equipment other than equipment included in the Tap.
"Construction" shall mean the construction, modification,
rearrangement, reactivation, or installation by Gulf South or its
designee of Requested Facilities to perform any service, including
any Requested Facilities necessary for Gulf South to receive and
deliver, or measure any gas received or delivered to, from, or on
behalf of any Customer requesting Gulf South's Construction of
such facilities.
24.2 A party or its agent shall submit a request to Gulf South to
construct Requested Facilities in conjunction with a request for
transportation services ("Requesting Customer"). Gulf South will
receive and process all such requests for Construction of
Requested Facilities in a manner that is not unduly
discriminatory.
24.3 Gulf South shall construct Requested Facilities under the
conditions provided below: