Gulf South Pipeline Company L P
Sixth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/01/2006, Docket: RP07- 15-000, Status: Effective
First Revised Sheet No. 2601 First Revised Sheet No. 2601 : Effective
Superseding: Substitute Original Sheet No. 2601
GENERAL TERMS AND CONDITIONS
Section 19
(Continued)
(b) To the extent a Customer has both points with and without
EFM, penalties hereunder shall be calculated as follows:
(1) If the OFO requires a Customer to take specific action
at either a receipt or delivery point then the measurement
type at each point where the action is to be taken will
control whether Section 19.1 or 19.1(a)(i) shall apply; or
(2) If the action requires that nominations are to be in
balance then the type of measurement at the delivery point
will control whether Section 19.1 or 19.1(a)(i) shall
apply. If the delivery point is an aggregate point
comprised of both points with and without EFM, that point
will be treated as a point without EFM for purposes of this
Section. To the extent that Gulf South issues an OFO that
does not fall in either of these two categories then the
OFO notice will explain how Customers with both EFM and
non-EFM points will be treated.
19.2 A Customer which on any day, takes gas in excess of one hundred
ten percent (110%) of its scheduled nominations (for a NNS
Customer, in excess of 110% of its Section 10.5 allocated
capacity) at any point under any interruption, curtailment or
allocation order issued by Gulf South pursuant to Section 10.5
hereof, shall pay to Gulf South, in addition to all other
applicable charges, an unauthorized overrun penalty, equal to two
(2) times the Daily Hub Price (for the day(s) in which the SMP
was in effect) for each Dekatherm taken.
19.3 During Critical Periods, firm Customers who exceed their contract
MDQ, NNS Customers that violate Section 10.3(e), and/or any
Customer responsible for submitting nominations at a point who
exceed their daily scheduled nominations by more than 5% at any
point with EFM shall be charged a penalty equal to two (2) times
the Daily Hub Price (for the day(s) in which the Critical Period
was in effect) per Dekatherm.