Gulf South Pipeline Company L P
Sixth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/01/2003, Docket: RP03-413-000, Status: Effective
Original Sheet No. 2445D Original Sheet No. 2445D : Effective
5.3.50 A Transportation Service Provider should support the ability for
the Releasing Shipper to specify, as a condition of a capacity
release offer, which recall notification period(s), as provided in
NAESB WGQ Standard No. 5.3.44, will be available for use by the
parties.
5.3.51 A Transportation Service Provider should support the ability for
the Releasing Shipper to specify, as a condition of a release,
whether the Releasing Shipper's recall notification must be
provided exclusively on a Business Day.
5.3.52 Affected Replacement Shippers should manage internal distribution
of notifications of recall received from a Transportation Service
Provider.
5.3.53 When capacity is recalled, it may not be reput for the same gas
day.
5.3.54 The deadline for notifying the Transportation Service Provider of
a reput is 8:00 a.m. to allow for timely nominations to flow on
the next gas day.
5.3.55 For the recall notification provided to the Transportation Service
Provider (TSP), the TSP's Tariff should specify whether the
quantity should be expressed in terms of a) total released
capacity entitlements or b) adjusted total released capacity
entitlements based upon the Elapsed Prorata Capacity. The capacity
entitlements resulting from the use of either a) or b) should be
the same.
5.3.56 In the event of an intra-day capacity recall, the Transportation
Service Provider (TSP) should determine the allocation of capacity
between the Releasing Shipper and the Replacement Shipper(s) based
upon the Elapsed Prorata Capacity (EPC). Variations to the use of
EPC may be necessary to reflect the nature of the TSP's tariff,
services, and/or operational characteristics.