Gulf South Pipeline Company L P
Sixth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/01/2003, Docket: RP03-413-000, Status: Effective
Original Sheet No. 2445C Original Sheet No. 2445C : Effective
5.3.46 When a Transportation Service Provider (TSP) sends Internet E-mail
notification for recalling of capacity to each affected
Replacement Shipper, the subject line of the E-mail should include
the following information separated by commas in the following
order: (1) "Recall", (2) the recall notification period, (3) the
Effective Date in YYYYMMDD format, (4) the name or abbreviation of
the TSP (excluding commas), and (5) the TSP's D-U-N-S® Number.
The body of such E-mail notification should contain at least the
affected Replacement Shipper's Contract Number, the quantity of
capacity being recalled, and the Offer Number or Award Number, if
necessary to uniquely identify the capacity being recalled.
Where supported by the TSP, for recalls that are effective at non-
standard times, the appropriate recall notification period should
be included in the subject line and the effective time of the
recall should be in the body of the E-mail.
Where TSPs offer capacity recall notification mechanisms in
addition to Internet E-mail, the notification should include at
least the same level of information.
5.3.47 The Replacement Shipper should provide the Transportation Service
Provider (TSP) with no more than two Internet E-mail addresses to
be used for recall notification. The obligation of the TSP to
provide notification is waived until at least one of the addresses
has been provided.
5.3.48 The Releasing Shipper should provide capacity recall notification
to the Transportation Service Provider (TSP) through the TSP's
Customer Activities Website. The recall notification should
specify the recall notification period for the specified effective
gas day, as well as any other information needed to uniquely
identify the capacity being recalled.
5.3.49 Recalled capacity notices should indicate whether penalties will
apply for the gas day for which quantities are reduced due to a
capacity recall.