Gulf South Pipeline Company L P
Sixth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/01/2003, Docket: RP00-340-005, Status: Effective
First Revised Sheet No. 2002 First Revised Sheet No. 2002 : Superseded
Superseding: Original Sheet No. 2002
GENERAL TERMS AND CONDITIONS
Section 13
13.8 In the event that unauthorized receipts or deliveries from Gulf
South become excessive at either a receipt or delivery point on
three (3) or more separate occasions during a consecutive twelve
month period, Gulf South will notify Customer of the situation by
facsimile and phone, after which Customer may be required to
provide, or cause to be provided, equipment acceptable to Gulf
South for control or takes of gas from Gulf South's system. Gulf
South shall report to the Commission within 30 days if Gulf South
requires Customer to provide flow control equipment.
13.9 Service may be interrupted or curtailed due to scheduled routine
repair, and maintenance. Gulf South shall give Customer(s)
reasonable notice of such interruption or curtailment and shall
endeavor to coordinate such interruption or curtailment with
Customer(s). Gulf South shall not be required to make alternate
arrangements for receipt or delivery of gas during these periods.
If Gulf South is unable to transport gas as a result of scheduled
maintenance, then Gulf South shall credit Customer's account for
the appropriate portion of the reservation charge for the period
of the interruption.
13.10 (a) After Gulf South receives a Customer's gas for
transportation, that Customer shall have the option to
contract to have its gas processed by a third party
processing plant operator or any gas processing plant owned
and operated by Gulf South or to receive a credit for Gulf
South revenues generated from the sale of the products
extracted. To the extent that Customer does not elect to
have its gas processed, Gulf South may process such gas or
cause gas to be processed. To the extent that gas is
processed for the account of a Customer, Gulf South will
charge Customer for the transportation of PTR. The charge
for transporting PTR shall be equal to the quantity of PTR
multiplied by the applicable rate for transportation between
the receipt points and the point where such gas is delivered
for processing.