GENERAL TERMS AND CONDITIONS
Section 10
(Continued)
(ii) The pressure on the system or a portion thereof
reaches a level that threatens the physical integrity
of the system. An OFO issued pursuant to this
Section shall be cancelled once pressures return to a
level that no longer threatens the physical integrity
of the system.
(iii) Emergency maintenance or repair of the system
including replacement of pipelines or portions
thereof, installation of taps, unscheduled testing of
storage fields or any other similar unscheduled
actions affecting the capacity of any portions of Gulf
South's system.
(iv) Total storage injection or withdrawal requirements by
all storage Customers exceed the capabilities of the
system. An order pursuant to this provision may
require that a Customer begin withdrawals from or
deliveries into system storage or increase or decrease
injections into the system.
(v) Any other event or action including the enforcement
or suspension of any provision of this Tariff which
Gulf South in its reasonable judgment believes is
necessary to preserve the operational integrity of
Gulf South's pipeline system or any portion thereof,
and the maintenance of total system deliverability,
or the quality of gas delivered. An OFO issued
pursuant to this Section shall be terminated once the
event or action that threatened the operational
integrity of the pipeline or portion thereof has been
resolved.