Gulf South Pipeline Company L P
Sixth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/08/2004, Docket: RP05- 64-000, Status: Effective
Third Revised Sheet No. 1409 Third Revised Sheet No. 1409 : Effective
Superseding: Second Revised Sheet No. 1409
GENERAL TERMS AND CONDITIONS
Section 7
(Continued)
(ii) Contents of Posting:
Gulf South shall post at least 24 hours prior to the
commencement of the bidding period the valid request.
This posting shall contain each specific primary
receipt and delivery point pair and the applicable
quantity at each primary point pair expressed in
Dekatherms, the applicable rate schedule, the minimum
reservation charge if applicable, the maximum
reservation charge, the term requested and the
maximum term available (maximum rate requests only).
(iii) Bidding Period:
The valid request will be posted according to the
following schedule:
Term of Service Bid Period
< 2 years 1 business day
> 2 years 2 business days
(iv) Bidding on Discounted Capacity:
From 10:00 a.m. to 11:00 a.m., Central Time, each day
during the bid period, bids and revisions which
increase existing bids may be submitted. A bid must
include the rate and the MDQ. The posted MDQ may not
be increased and the posted term cannot be changed.
All bids are considered binding upon receipt by Gulf
South; however, a bidder may withdraw its bid prior
to the close of the Bid Period. If a bidder
withdraws a bid, it is precluded from submitting a
lower bid for the capacity.