Trans-Union Interstate Pipeline, L.P.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/07/2006, Docket: RP06-217-000, Status: Effective
Original Sheet No. 132 Original Sheet No. 132 : Effective
(iii)If requested, Transporter will post offers and bids,
including
prearranged deals, upon receipt. If a Releasing Shipper requests
a later
posting time, Transporter will support such request insofar as it
comports
with the standard timeline set forth in Section 26.2(d) of the
General Terms
and Conditions of this Tariff.
(iv) A Releasing Shipper may not specify an extension of the
original bid
period or the pre-arranged deal match period, without posting a
new release.
(v) Releasing Shipper may specify dollars and cents or percents
of maximum
tariff rate in the denomination of bids. Once the choice is made
by the
Releasing Shipper, the bids should comport with the choice.
(vi) For the capacity release business process timing model set
forth in
Section 26.2(d) of these General Terms and Conditions, only the
following
methodologies are supported by Transporter and provided to
releasing shippers
as choices from which they may select and, once chosen, should be
used in
determining the awards from the bid(s) submitted. They are: 1)
highest rate,
2) net revenue and 3) present value. Other choices of bid
evaluation
methodology (including other releasing shipper defined evaluation
methodologies) can be accorded similar timeline evaluation
treatment at the
discretion of Transporter. However, Transporter is not required
to offer other
choices or similar timeline treatment for other choices, nor, is
Transporter
held to the timeline should the releasing shipper elect another
method of
evaluation.
(f) If the Releasing Shipper wishes to recall capacity to be
effective for a
Gas Day, the notice should be provided to Transporter and the
acquiring
shipper no later than 8 A.M. Central Clock Time on nomination
day. The
Releasing Shipper may not effect a partial day recall of
capacity. Such
notification will confirm that the conditions of recall have been
met and will
be accompanied by the scheduling information required by Sections
5 and 7. A
Releasing Shipper may specify in the Release Request whether the
recalled
capacity is to be reput to the original Replacement Shipper and
the terms of
the reput. These terms may be either: (i) reput must be accepted
by the
original Replacement Shipper for the original terms of the
release or (ii)
reput may be accepted at the option of the original Replacement
Shipper for
the original terms of the release. The Releasing Shipper may
effect a reput by
notifying Transporter and Replacement Shipper by 8:00 A.M.
Central Clock Time
on the day of the nomination deadline on the day prior to the
effective date
of the reput of entitlements to Replacement Shipper.