their owner, but upon request each will submit to the other its records and charts,
together with calculations therefrom, for inspection and verification, subject to return
within 30 days after receipt thereof.
4.6 Transporter and Shipper shall each preserve for a period of at least 3 years all test
data, charts and other similar records or such longer period as may be required by the
Commission. Microfilms of the original documents shall be considered true records.
4.7 In the event a meter is out of service or registering inaccurately, the volume of Gas
delivered during the period that such meter is out of service or registering
inaccurately shall be determined:
(a) By using the registration of any check meter or meters, if installed and
accurately registering; or, in the absence of (a);
(b) By correcting the error if the percentage of error is ascertainable by
calibration, tests, or mathematical calculation; or, in the absence of both (a)
and (b);
(c) By estimating the quantity of delivery by deliveries during periods under
similar conditions when the meter was registering accurately.
4.8 Prior Period Adjustments – Pursuant to NAESB Standards 2.3.7 (Version 1.8), 2.3.11
(Version 1.8), 2.3.12 (Version 1.8), 2.3.13 (Version 1.8), 2.3.14 (Version 1.8): The
cutoff for the closing of measurement is 5 business days after the business month.
For treatment of measurement prior period adjustments, treat the adjustment by taking
it back to the production month. A meter adjustment becomes a prior period
adjustment after the fifth business day following the business month. For reporting
measurement prior period adjustments, report it with the restated line item with new
total quantity for the day and the month. Estimate missing or late measurement data
and treat actual as a prior period adjustment, with the measuring party to provide the
estimate. Measurement data corrections should be processed within 6 months of the
production month with a 3 month rebuttal period. This standard shall not apply in the
case of deliberate omission or misrepresentation or mutual mistake of fact. Parties’
other statutory or contractual rights shall not otherwise be diminished by this
standard.
5. NOMINATIONS
5.1 For service required on any day under each of Shipper's Transportation Service
Agreements, Shipper shall provide Transporter with a nomination(s) providing the
Shipper’s Receipt Point, contract numbers, the applicable service, the quantity of Gas