Trans-Union Interstate Pipeline, L.P.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/07/2006, Docket: RP06-217-000, Status: Effective
Original Sheet No. 20 Original Sheet No. 20 : Effective
STATEMENT OF RATES AND CHARGES
All rates are stated in U.S. $
Rate Schedule FT1/
Recourse Rates:
Maximum Minimum
Reservation
Charge ($ per
MMBtu per month) $1.6455 0.00
Usage Charge
($ per MMBtu 0.00 0.00
Negotiated Rates:
The effective maximum negotiated reservation charge for any
negotiated rate
transportation agreement is the charge agreed to by the parties,
as set forth
in the attached tariff sheets.
Rate Schedule IT1/
Maximum Minimum
Usage Charge
($ per MMBtu) $0.0541 0.00
1. An ACA Unit Charge, currently $0.0018 per MMBtu, calculated
in
accordance with section 23 of the General Terms and Conditions of
Transporter's FERC Gas Tariff, shall be added to all quantities
of gas
scheduled for transportation under Rate Schedule FT and IT.
Trans-Union
reserves the right to amend this FERC Gas Tariff and Rate
Schedule at any time
to make any GRI adjustment, and/or to recover any fuel or lost
and unaccounted
for gas.