GENERAL TERMS AND CONDITIONS

 

26. CAPACITY RELEASE (Continued)

 

26.4 Release Procedures. (continued)

 

(d) Submitting a Bid (continued)

 

(6) An affirmative statement that Replacement Shipper agrees to be

bound by the terms and conditions of Rate Schedules FT or LFS

and Transporter's capacity release provisions in its tariff.

 

(7) Whether the bid is a contingent bid and the contingencies

which must be satisfied by the date specified by the Releasing

Shipper in its posting of the Parcel.

 

 

(e) Rates. No rate cap applies to releases of capacity for a period of one

year or less only when the release is to take effect on or before one

year from the date on which the pipeline is notified of the release.

 

For releases of capacity with terms of greater than one year, the

maximum rate for a volumetric release shall not exceed the volumetric

reservation charge for the released capacity plus all applicable

surcharges; and the maximum rate for all other releases with terms of

greater than one year shall be the applicable maximum reservation rate

plus all applicable surcharges set forth in this FERC Gas tariff,

notwithstanding any discounts then in effect for the Releasing

Shipper.

 

 

(f) Confirmation of Bids

 

It is the Replacement Shipper's sole responsibility to confirm the

correctness of the submitted bid and to take any corrective action

necessary by resubmitting a bid when notified of an invalid or

incomplete bid by Transporter. This must be done before the close of

the Bid Period.