Tuscarora Gas Transmission Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2009, Docket: RP09-08-000, Status: Effective
Original Sheet No. 138 Original Sheet No. 138
GENERAL TERMS AND CONDITIONS
26. CAPACITY RELEASE (Continued)
26.3 Preliminary Qualification.
Replacement Shippers are encouraged to pre-qualify in advance of any
postings on Transporter's EBB as credit requirements will take
differing amounts of time to process depending on the particular
financial profile of Replacement Shippers. The pre-qualification
process will authorize a pre-set maximum monthly financial exposure
level for the Replacement Shipper. Such exposure levels may be
adjusted by Transporter periodically re-evaluating a Replacement
Shipper's creditworthiness.
Releasing Shippers may exercise their option to waive the credit
requirements for any Replacement Shipper wishing to bid on a Parcel
posted by that Releasing Shipper. Such waiver must be made on a
nondiscriminatory basis. Transporter must be informed of such waiver
via the EBB before it will authorize such Replacement Shipper's
participation with respect to that particular Parcel. In this
instance, no pre-set maximum monthly financial exposure level is
applicable.
Should a Releasing Shipper waive the credit requirements for a
Replacement Shipper, the Releasing Shipper shall be liable for all
charges incurred by the Replacement Shipper in the event such
Replacement Shipper defaults on payment to Transporter for such
capacity release service.