Tuscarora Gas Transmission Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/01/2009, Docket: RP09-926-000, Status: Effective
First Revised Sheet No. 125 First Revised Sheet No. 125
Superseding: Original Sheet No. 125
GENERAL TERMS AND CONDITIONS
22. NOTICES, COMMUNICATION, AND POSTINGS (Continued)
22.2 Intraday Bump Notice, Operational Flow Orders, and Other Critical
Notices (Continued)
(f) [NAESB WGQ Standard 5.3.39] Transportation Service Providers may
offer notification mechanisms in addition to those references in
NAESB Standard 5.3.34, General Terms and Conditions Section 22.2(a)
(e.g. EBB/EDM, FF/EDM). TSPs should include at least the same level
of information for notification of an intraday bump, operation flow
order or other critical notice regardless of the method of
notification.
(g) [NAESB WGQ Standard 5.3.40] Intraday bump notices should contain at
least the affected Service Requester Contract, Receipt and/or
Delivery Location, and Receipt and/or Delivery Point Quantity from
the Scheduled Quantity (NAESB Standard 1.4.5).