Trunkline LNG Company, LLC

Second Revised Volume No. 1-A

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 01/15/2007, Docket: RP07-109-000, Status: Effective

First Revised Sheet No. 110 First Revised Sheet No. 110 : Pending

Superseding: Original Sheet No. 110

 

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

 

13. MEASUREMENT (Continued)

 

(G) The quantity of Dt's loaded or unloaded from the

Shipper's Vessel(s) shall be calculated on the

basis of the following formula:

 

Q = V x M x Pc

----------

252

 

in which

 

Q = the number of Dt's unloaded

 

V = the volume of LNG loaded or unloaded, in

m3, as determined in accordance with

Section 13.2(A)

 

M = the density calculated in accordance with

Section 13.2(C) of the LNG in

kg/M3

 

Pc = the GHV of LNG per unit of mass, in

thermies/kg, as calculated in accordance

with Section 13.2(F)

 

The Quantity of LNG unloaded from the Vessel for

Shipper's account shall not include the amount

of boil-off returning to Shipper's Vessel during

unloading of LNG.

 

(H) Gauging Equipment

 

(1) Shipper shall cause to be supplied, operated

and maintained equipment for accurately gauging

the level of liquid and liquid temperature in

the tanks of the LNG Vessel. TLNG shall

supply, operate and maintain all equipment,

instruments and devices used for the sample of

and for the determination of the density,

quality and composition of the LNG unloaded.

 

(2) All measurements and calculations relating to

gauging and determination of the density of

the LNG and the testing of the quality and

composition of the LNG shall be performed by

TLNG. Representatives of Shipper shall have

the right to be present, but the absence of a

duly summoned representative of Shipper shall

not prevent either the carrying out of the

measurements or the preparation of the

calculations.