Trunkline LNG Company, LLC
Second Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2009, Docket: RP09-799-000, Status: Effective
Original Sheet No. 42 Original Sheet No. 42
RATE SCHEDULE IAV (Continued)
INTERRUPTIBLE ALTERNATE VAPORIZATION
2.4 In no event shall TLNG be obligated to provide any
Alternate Vaporization Service which would require the
construction or acquisition of new facilities or the
modification or expansion of existing facilities.
3. RATES
The rates and charges for interruptible service under this Rate
Schedule IAV shall be as follows:
3.1 Usage Charge
The monthly Usage Charge shall be the product of the
actual Quantity of LNG regasified during the Month and the
usage rate per Dt for service, as set forth on the
effective Tariff Sheet No. 5.
3.2 Surcharges
No surcharges shall be applicable to service under this
Rate Schedule IAV.
3.3 Fuel Reimbursement
Fuel reimbursement is inapplicable to volumes of
Regasified LNG delivered under this Rate Schedule IAV.
3.4 Range of Rates
Unless otherwise agreed to in writing between Shipper and
TLNG, any rate applicable to Shipper for service hereunder
shall be the applicable Maximum Rate set forth on the
effective Tariff Sheet No. 5, plus all applicable
surcharges and any other charges specified in the General
Terms and Conditions, as may be applicable from time to
time. If an amount less than the applicable Maximum Rate
and not less than the applicable Minimum Rate is agreed
upon, such amount shall be applied prospectively. TLNG
shall be responsible for compliance with any reporting
requirements prescribed by the Commission. TLNG shall not
be required to enter into any Service Agreement for
Alternate Vaporization at a rate less than the Maximum
Rate per Dt.