Trunkline Gas Company, LLC
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2003, Docket: RP03-534-000, Status: Effective
Original Sheet No. 312 Original Sheet No. 312 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
27. TRANSITION COSTS (Continued)
shall be paid. In addition, Trunkline shall submit a
report to the Commission setting out a comparison of its
GSR Costs and the amounts collected hereunder and any
repayments actually made.
(3) If Trunkline's collections hereunder are less than its
GSR Costs, Trunkline shall be permitted to recover such
deficiency, including carrying charges, during the
Carryover GSR Cost Collection Surcharge Period by filing
with the Commission GSR Reservation Surcharges and
interruptible Transportation rates within ninety (90)
days of the conclusion of the Initial GSR Cost
Collection Period. The GSR Reservation Charge will be
determined by dividing the remaining GSR Costs
attributable to firm service to be recovered through the
GSR Reservation Surcharge by the design billing
determinants underlying Trunkline's then-effective rates
applicable to Rate Schedules FT, SST, EFT, QNT and LFT.
The remaining GSR Costs to be recovered in the rates
under Rate Schedules IT and QNIT shall be determined by
dividing the remaining GSR Costs attributable to
interruptible services by the applicable interruptible
service design determinants underlying Trunkline's then-
effective rates. The Carryover GSR Costs Collection
period shall commence on the first day of the Month
following Commission approval of such filing.
27.3 Treatment Of Other Transition Costs
This Section 27.3 establishes procedures by which Trunkline will
recover the costs of restructuring its services in accordance with
FERC Order No. 636, et seq. and 18 C.F.R. Part 284 other than Gas
Supply Costs, the recovery of which shall be governed by Section
27.2 herein, and Unrecovered FERC Account No. 191 balances, the
recovery of which shall be governed by Section 27.1 herein.
(A) Costs of New Facilities
Trunkline shall be entitled to file under Section 4 of the
Natural Gas Act and the Commission's Regulations and recover
the capital costs and other costs incurred for, and in