Trunkline Gas Company, LLC
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2003, Docket: RP03-534-000, Status: Effective
Original Sheet No. 272 Original Sheet No. 272 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
13. QUALITY
Trunkline shall not be obligated to accept Gas for Transportation which
does not meet these quality provisions:
13.1 Gas received shall be merchantable Natural Gas; shall be free of
water and hydrocarbons in liquid form; shall contain not more
than 7 pounds of water vapor per Mmcf unless otherwise agreed to
in advance by Trunkline, 1.0 grain of hydrogen sulphide and twenty
(20) grains of total sulphur per one hundred (100) cubic feet, 2%
of carbon dioxide and 3% of nitrogen (by volume), and fifty (50)
parts per million of oxygen; shall not contain any active bacteria
or bacterial agent, including but not limited to sulphate reducing
bacteria and acid producing bacteria; shall not contain any
hazardous or toxic substances; and shall not exceed one hundred
twenty degrees (120ø) Fahrenheit in temperature.
13.2 Shipper or Shipper's designee will have the right to process Gas
for the removal of liquids and liquefiable hydrocarbons, except in
case of emergency or if the Gas fails to meet quality
specifications, by electing to exercise such right in writing at
the time the Transportation Service Agreement is executed and
thereafter prior to each January 1 for the next calendar year.
For any period for which the processing election is exercised,
Shipper or Shipper's designee shall be obligated to process all
Quantities of Gas transported under the Transportation Service
Agreement during such period from designated Points of Receipt.
The Quantity of Gas delivered hereunder at the Points of Delivery
shall be Thermally Equivalent to the Quantity of Gas received at
the Points of Receipt less Fuel Reimbursement and the reduction
due to processing. Shipper may satisfy the foregoing requirements
by having the gas which it ships dehydrated so that it conforms to
the quality specifications, so long as such dehydration is
performed onshore prior to the first Trunkline compression
facility. As used throughout this Section 13, the term
"processing" shall be interpreted to include "dehydration."