Trunkline Gas Company, LLC
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/23/2009, Docket: RP09-250-000, Status: Effective
First Revised Sheet No. 265 First Revised Sheet No. 265
Superseding: Original Sheet No. 265
GENERAL TERMS AND CONDITIONS
(Continued)
9. CAPACITY RELEASE (Continued)
9.8 Term
(A) Any release under this Section 9 shall be for a minimum term
of at least one Gas Day.
(B) Any release under this Section 9 shall be for a maximum term
expiring on the earlier of:
(1) The last date this Tariff provision shall be effective;
(2) The expiration date of Releasing Shipper's Service
Agreement when the release is for the full term of such
agreement; or
(3) The expiration date specified by the Releasing Shipper
in the Shipper Notice.
9.9 Billing Adjustments to Releasing Shipper
(A) Trunkline shall credit Releasing Shipper's monthly bill to
reflect the Reservation Charge or Capacity and Deliverability
Charges (including surcharges, if any) invoiced to
Replacement Shipper provided, however, that Trunkline and
Releasing Shipper may, in connection with a Negotiated Rate
based on a rate design other than straight fixed variable,
agree upon a payment obligation and crediting mechanism that
varies from or is in addition to the provisions of this
Section 9.9 in order to establish the basis of accounting for
revenues from a Replacement Shipper as a means of preserving
the economic bases of the Negotiated Rate. In the event of a
release with a volumetric rate, the volumetric rate shall be
no greater than the 100% load factor equivalent of the
Maximum Rate currently applicable to the service released and
shall be credited to the Releasing Shipper's monthly bill.
Replacement Shipper's payment of the Usage Charge and
applicable usage surcharges, if any, will be retained by
Trunkline; provided, however, that the Volumetric Charge to
be retained under Rate Schedule FFZ shall be the Minimum
Volumetric Rate as set forth on the effective Tariff Sheet
No. 15. Notwithstanding the above, no 100% load factor
equivalent limitation shall apply to a capacity release for a
period of one year or less if the release is to take effect
on or before one year from the date on which Trunkline is
notified of the release.