Trunkline Gas Company, LLC
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/23/2009, Docket: RP09-250-000, Status: Effective
Second Revised Sheet No. 258 Second Revised Sheet No. 258
Superseding: First Revised Sheet No. 258
GENERAL TERMS AND CONDITIONS
(Continued)
9. CAPACITY RELEASE (Continued)
(2) For biddable releases (more than 1 year)
The timeline is the same as biddable releases for 1 year
or less except that the Releasing Shipper shall post the
Shipper Notice on the Messenger® system by 12:00 p.m.
Central Time four (4) Business Days before the
award. Open season ends no later than 1:00 p.m. Central
Time on the Business Day before timely nominations are
due (open season is three Business Days).
(3) Timeline for Releases with Special Conditions
If the Releasing Shipper specifies a bid evaluation
methodology other than highest rate, net revenue or
present value, or a permanent release or any other
special conditions, the above timelines shall apply;
provided, however, one additional Business Day will be
added to the evaluation period. Such extended evaluation
period shall cause Gas flow to be at least one day later
than Gas could flow under the timeline set forth in
Section 9.4(B)(1) or Section 9.4(B)(2).
(C) All bids must be expressed in dollars and cents or percents
of Maximum Rate, whichever is stated in the Shipper Notice,
include the required bid information and must be received and
posted electronically through the Messenger® system. Bids
shall be posted on the Messenger® system with any
contingencies identified and with the bidder's identity
deleted.
(D) A bidder may submit only one bid at a time in response to a
Shipper Notice. A bidder may withdraw its bid through
the Messenger® system at any time prior to the close of the
posting period specified in the Shipper Notice without
prejudice to its submitting another bid with an economic
value equal to or greater than the economic value of the
withdrawn bid.
(E) Where there is a PRS and a bid which is better than the
bid submitted by the PRS, Trunkline will notify the PRS by
2:00 p.m. Central Time on the day capacity is awarded and the