Trunkline Gas Company, LLC

Third Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 08/01/2003, Docket: RP03-534-000, Status: Effective

Original Sheet No. 233 Original Sheet No. 233 : Effective

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

 

5. TRANSPORTATION BALANCING

 

5.1 Daily Scheduling

 

(A) Except as provided in Section 5.1(E), each Transportation

Service Agreement, TABS-1 Service Agreement and Operational

Balancing Agreement (OBA) with a daily scheduling variance

exceeding the Tolerance Level as stated in the applicable

Rate Schedule or OBA, plus the available MDVQ at a Point of

Delivery if the Shipper, TABS-1 Party or OBA Party, as

applicable, is a DVS Party at such point, shall be subject to

a daily scheduling penalty in accordance with this Section

5.1; provided, however, that no individual Service Agreement

receiving or delivering Gas at a Point of Receipt or Point of

Delivery shall be assessed a daily scheduling penalty if: (1)

the aggregate receipts or deliveries for all Service

Agreements at such Point, as applicable, do not exceed the

aggregate Quantity scheduled at such point by the Tolerance

Level plus the available MDVQ if the delivery point operator

is a DVS Party or (2) an interruptible Shipper's scheduled

Quantity for a Gas Day has been reduced as a result of a

nomination by a firm Shipper during the Evening Nomination

Cycle or the Intra-day 1 Nomination Cycle in Section 3.1(C)

herein.

 

(1) Except as set forth below, daily scheduling variance

shall be the absolute value of the percentage of: (a)

the difference between the scheduled Quantities at each

Point of Receipt and each Point of Delivery each Gas Day

and the Quantity of Gas allocated to such point divided

by (b) Quantities scheduled for receipt or delivery, as

applicable.

 

(2) When Shipper is utilizing a Point of Receipt or Point of

Delivery with service provided by a TABS-1 Party or an

OBA Party, as applicable, Shipper's confirmed nomination

Quantity at such point will be the actual Quantity for

purposes of calculating the daily scheduling variance.

 

(3) The daily scheduling variance for a TABS-1 Party or an

OBA Party will be the difference between the total